MAKOTO TIGER™ (DELL PRO MAX GB10) • AVAILABLE TODAY
SOVEREIGN HARDWARE APPLIANCE FLEET

Sovereign Hardware Appliance Fleet

Explore dedicated physical on-premise hardware appliances powered by local Blackwell and Ada micro-architectures to eliminate cloud egress and deliver 100% data sovereignty behind enterprise firewalls. The Makoto Tiger™ (Dell Pro Max GB10) is available today for drop-ship procurement via our authorized Dell OEM partner channel, with multi-node clusters and workstation nodes advancing through certification.

Configuration 1 // Workstation Node

Makoto Ocelot™

Single workstation node engineered for Academic Research Centers, MedTech device clinical pilots, Phase 1 PK/PD units, and animal health trials.

  • Chassis: Dell Precision 5860 Tower
  • GPU: 1x NVIDIA RTX 5000 Ada Generation (32GB GDDR6 ECC VRAM)
  • Compute: Intel Xeon W-Class, 128GB DDR5 ECC RAM
  • Model Profile: Dual Concurrent Gemma 12B FP8 Models (Inference + Judge)
  • Target Output: Medidata Rave ALS & REDCap schema builds
STATUS: In Design Certification • Zero Egress
Configuration 2 // Micro-Workstation
Available Today

Makoto Tiger™

Compact micro-workstation engineered for single-team pharma sponsors and scaling mid-market Contract Research Organizations (CROs). Available today for immediate deployment.

  • Chassis: 1x Dell Pro Max GB10 Micro-workstation
  • GPU / VRAM: Single Blackwell GPU, 128GB Unified High-Speed VRAM
  • Safety Interlock: Physical execution halt signal bus circuitry
  • Model Profile: Uncompressed Gemma 4 26B Specialist + 31B Judge
  • Consensus Engine: 4-Persona Scrum Gate validation engine
  • Hardware Procurement: $7,000 (Dell OEM channel exclusive • third-party retail not supported)
STATUS: AVAILABLE TODAY • Dell OEM Order Ready • Zero Egress
Order Makoto Tiger™ ($7,000) →
Configuration 3 // HA Cluster

Makoto Jaguar™

2-Node High-Availability Cluster designed for tier-1 CROs and mid-sized pharmaceutical sponsors running 15+ concurrent trial designs.

  • Chassis: 2x Dell Pro Max GB10 Micro-workstations
  • GPU / Interconnect: Dual Blackwell GPUs, 256GB Unified VRAM, NVLink
  • High Availability: Active-Active zero-downtime failover & state migration
  • Model Profile: Distributed Gemma 4 MoE Specialist + 31B Judge
  • Ecosystem: Universal EDC translation (Rave, Veeva, REDCap)
STATUS: High-Availability Architecture • Zero Egress
Configuration 4 // Mega-Cluster

Makoto Cheetah™

4-Node Enterprise Mega-Cluster engineered for Global Top-20 Pharmaceutical sponsors conducting 40+ concurrent global Phase II/III trials.

  • Chassis: 4x Dell Pro Max GB10 Quad Cluster
  • GPU / Interconnect: 8x Blackwell GPUs, 512GB Unified VRAM, NVLink
  • Acceleration: vLLM Tensor Parallelism + 4-Persona Consensus acceleration
  • Compliance: Enterprise GxP 21 CFR Part 11 cryptographic audit vault
  • Deployment: Dell OEM white-glove rack installation & 4-hour on-site SLA
STATUS: Enterprise Flagship • Zero Egress
Immediate Hardware & Software Availability

Deploy Makoto Tiger™ & G-Flow Software Today

The Makoto Tiger™ micro-workstation ($7,000) is available today for drop-ship procurement via our authorized Dell OEM partner channel. Reserve your seat in one of our Sovereign Cohorts to receive factory pre-loaded hardware, or license the G-Flow compiler for immediate local enterprise deployment.